Shenzhen King Hardware & Building Material Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Fu Canna
  • Company Name : Shenzhen King Hardware & Building Material Co., Ltd.
  • Tel : 86-755-27266644
  • Fax : 86-755-27266644
  • Address : Guangdong,Shenzhen City,Shajing Town
  • Country/Region : China
  • Zip : 518104

Steel Scaffolding Walking Board

Steel Scaffolding Walking Board
Product Detailed
Related Categories:Scaffoldings
1.Steel Scaffolding Walking Board 2.Material:Q195-Q235 3.Surface treat:hot-dipped galvanised 4.Width:210,225,240,250,420

Product detail:

1.Steel Scaffolding Walking Board

2.Material:Q195-Q235

3.Surface treat:hot-dipped galvanised

4.Width:210,225,240,250,420,480,500mm

5.Thickness: 1.0-2.0mm

6.Length: To be produced as per your requirement

7.Folding box should be more stronger

8.Patent holes design to be reduced products' weight

9.Patent ribs make products stronger and drain the water providing any rain days 

10.Life time:5 years guarantee

Dimension: 

ItemWide (mm)Height (mm)Thickness (mm)Length (m)Folding Boxsupport bracketWeight (kg)
KH-SW-210-001210451.11.0 Normalflat support3.33
KH-SW-210-002210451.11.5 Normalflat support4.87
KH-SW-210-003210451.12.0 Normalflat support6.4
KH-SW-210-004210451.12.5 Normalflat support7.93
KH-SW-210-005210451.13.0 Normalflat support9.46
KH-SW-210-006210451.14.0 Normalflat support12.53
KH-SW-210-007210451.11.0 Normalrectangular support3.41
KH-SW-210-008210451.11.5 Normalrectangular support5.03
KH-SW-210-009210451.12.0 Normalrectangular support6.64
KH-SW-210-010210451.12.5 Normalrectangular support8.25
KH-SW-210-011210451.13.0 Normalrectangular support9.86
KH-SW-210-012210451.14.0 Normalrectangular support13.09
KH-SW-210-013210451.11.0 Normaltrapezoid support3.38
KH-SW-210-014210451.11.5 Normaltrapezoid support4.97
KH-SW-210-015210451.12.0 Normaltrapezoid support6.55
KH-SW-210-016210451.12.5 Normaltrapezoid support8.13
KH-SW-210-017210451.13.0 Normaltrapezoid support9.71
KH-SW-210-018210451.14.0 Normaltrapezoid support12.88

How to extend scaffolding walking Board

1.Have a 'competent person' assess and document the needs of the area for extended

scaffolding. A 'competent person' in some states is required to have special licensing,

and in others experience with scaffolding set up is enough. What is important is that

you keep some form of documentation that the person designated as 'competent'

approves each step of the scaffolding assembly

2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,

make sure that the supports for your scaffolding plans follow the assembly plans

3.Lay your first plank across the supports of your platform. Have your competent

person check that each plan extends a minimum of 6 inches and a maximum of

12 inches past any support bracket.

4.Extend your scaffolding plank by laying the next plank over it. If the span

of your support is 7 feet, your plans must overlap a minimum of 6 inches up

to a maximum of 12 inches. If the span of your plank support is 10 feet, the boards

must overlap 12 inches.

5.You may provide cleats to additionally connect your extended scaffold planks again.

Ask your competent person to designate that the cleats are provided and used only

to prevent the scaffold planks from sliding and not as a means of providing any

re-enforcement to the boards at all.

Steel Scaffolding Walking Board



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.